![]() |
|||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| To see other entries click on the links bellow. |
|||||||||||||||||||||||||||||||||||||||||
| Day Four |
|||||||||||||||||||||||||||||||||||||||||
| Last Entry |
Day Two |
||||||||||||||||||||||||||||||||||||||||
| Day Three |
|||||||||||||||||||||||||||||||||||||||||
| Day One |
|||||||||||||||||||||||||||||||||||||||||
| The first thing I did was un-pack the model from the box and carefully inspect the pieces. Next I looked at my lighting diagram and made sure that all the LEDS will fit into there designated holes, and if not I made the holes bigger with a drill bit. I also drilled holes in the pylons to the nacelles for the wires to go through. Finally for the day I painted the stand for the model. Now in this model not all of the parts will arrive together, because this model is not for a client it is a personal model that I am paying for out of my own pocket. Time: 1 hour |
|||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Pieces laid out |
|||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Lighting Diagram |
|||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Holes drilled For wires to go to the nacelles |
|||||||||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||||||||
| Base of stand with first coat |
|||||||||||||||||||||||||||||||||||||||||
| To see other entries click on the links bellow. |
|||||||||||||||||||||||||||||||||||||||||
| Day Three |
Day Four |
||||||||||||||||||||||||||||||||||||||||
| Last Entry |
Day Two |
||||||||||||||||||||||||||||||||||||||||
| Click Here to E-mail Us |
|||||||||||||||||||||||||||||||||||||||||